North South Line

From BVE Wiki
Jump to navigation Jump to search
Author:
Original: Jerry, Flip, and Joey. Current: SMB3087R
Version:
1.5 Beta
Last Update:
2020-10-08
Country:
Singapore Flag-sin.gif
Fictional:
no
Length:
46 km
Runs on:
OpenBVE
Trains:
Any NSEWL Train
URL:
https://drive.google.com/file/d/1am_BkcUtR4Dy0rxodrIDxL8EQERcfrpZ/view?usp=sharing

Nsl route.png

History

It all started as a project started by Jerry, Flip and Joey. Also known as the NSL team. The original version at v0.9.1 Alpha was the final released version. It only features the track’s turns. v0.9.1 only have stations from Jurong East to Bishan. Then a guy known as SMB5888H on youtube, built it all the way to Marina South Pier. At v1.0 alpha, his development halted. SMB3087R Studios (also me who created this page), created v1.2 pre-beta which is not much of an update. Just station signs for above ground stations. Then v1.5 beta 1 was released. v1.5 features station objects (not all yet). A proper roofing for stations. And some station roof supports.

Changelog

v0.9.8

Built to Marina South Pier.

v0.9.9

Made some stopping points aligned to the platform screen doors.

v1.0

Bug fixes

v1.2 pre beta

Added station signs. More North Bound train objects

v1.5 beta

Added new station objects.

v2.0 beta 2 (not released yet)

Added some roof supports for Kranji to Sembawang. (Except Woodlands). Added some roads. Better looking viaducts. Better rails.